Automated Pre-Construction Controls
We convert 500+ page specification manuals into field-ready Procore submittal logs and Primavera P6 baseline schedules in under 24 hours. Zero staff hours spent reading manuals.
Engineering Service Deliverables
Software-ready preconstruction controls built for direct bulk-import into Procore, Autodesk Construction Cloud (ACC), Primavera P6, and Excel.
Submittal Register Extraction
Complete extraction of every action submittal, mix design, ASTM test standard, and closeout O&M manual requirement across CSI Divisions 01–33.
Advance Notices & Permits
Identifies hot work permits, confined space entries, utility shutdown notification windows, and agency inspection milestones before breaking ground.
Primavera P6 Baseline Logic
Standard WBS levels, activity codes, calculated durations, and CPM predecessor/successor linkages mapped directly to spec lead times.
Drawing Addenda Diffs
Color-coded plan revision comparison highlighting modified storm lines, inlets, footings, structural steel, or grading changes across drawing releases.
Test Our Pipeline on Your Next Bid — 100% Free Pilot
Send us any active or past spec book PDF. We will return your completed Procore submittal register and P6 baseline draft in 24 hours at zero charge.
Built for Contractors Who Bid Often
One predictable monthly retainer built around your bid volume. Request a quote and we'll send a proposal.
Unlimited Growth Partner
Low predictable monthly base with flexible pay-per-job volume. Scale without limits.
- Includes: 2 Full Projects included free every month
- Volume Rate: Discounted rate for any additional project
- Priority Delivery: 12-hour turnaround for quick bid deadlines
- Addenda Updates: Free re-runs on drawing and spec revisions
- Dedicated Slack / Direct Estimator Support
All engineering outputs adhere to CSI MasterFormat, ASTM, ACI, and DOTD standards. 100% industry standard and software-ready.
Deliverables & Output Formats
Standardized engineering formats ready for instant team coordination and PM workflows.
| Service Action | Engineering Scope & Details Extracted | Output Format | Turnaround |
|---|---|---|---|
| Submittal Register | Every action submittal, mix design, ASTM test standard, and closeout O&M manual requirement. | Excel (.xlsx) / CSV | < 24 Hours |
| Advance Notices & Permits | Hot work permits, confined space entry, utility shutdown windows, and agency inspection rules. | Excel / Summary PDF | < 24 Hours |
| Primavera P6 Baseline | Standard WBS levels, activity codes, durations, and logic ties (predecessors/successors). | P6 XER / XML / XLSX | < 24 Hours |
| Drawing Addenda Diffs | Color-coded plan revision comparison highlighting modified storm lines, inlets, or grade changes. | Layered PDF | < 12 Hours |
Request Free Pilot or Submit Project
Send us your active or past spec book link. We'll return your completed deliverables within 24 hours.
